This project consists of removing and replacing the cooling tower unit from the (Montrose) Bexley City School Campus
Site Walk Schedule: 1/17/2023 at 10AM
RFI's Due: 1/31/2023 at 12PM
Bids Due: 2/7/2023 at 12PM
Contractor Scope of Work OH3-22-0006 Cooling Tower Replacement IAP270 - With Exhibit
.pdf
Download PDF • 6.66MB